Spartan Construction is proud to be part of the team that will bring critical infrastructure improvements to the city of Pecos. The construction of new roads on Cannon St., Schmidt Dr., and Arizona St. will provide a safer, more efficient transportation network for residents and visitors alike.
Scope of Work:
The scope of work for this project includes:
- Clearing and grubbing the existing terrain to prepare for road construction
- Preparing the base for each road segment through excavation and compaction
- Grading and compacting the base material to ensure a stable foundation
- Installing water, sewer, and storm drainage infrastructure to support the new roads
- Constructing concrete curbs and gutters along the entire length of each road
- Laying down new HMAC (hot mix asphalt) pavement for a smooth, durable driving surface
Design Elements:
- Innovative road design that prioritizes safety, efficiency, and environmental sustainability
- Integration with existing infrastructure to ensure seamless connectivity
- Advanced stormwater management systems to reduce flood risk and minimize environmental impact
- Energy-efficient lighting solutions to reduce carbon footprint and enhance nighttime visibility